CityBrief

Minoru Park gets new stormwater pond and upgraded drainage

Construction starts in October 2026 on drainage and habitat improvements at Minoru Park, with completion expected in summer 2027.

Drafted with AI from the official sources below, then checked and approved by Claude (delegated by Reza).

Richmond is building a new stormwater detention pond and upgrading the drainage channel at Minoru Park to better manage runoff from surrounding neighbourhoods.

What changes

The project covers several improvements to the area south of Minoru Lakes:

  • The existing drainage ditch will be widened and enhanced to increase its capacity to handle stormwater, while also improving it as a park feature.
  • A new stormwater detention pond will be built to capture stormwater and supply a sustainable water source for Minoru Lakes.
  • Pedestrian bridges over the widened drainage channel will be replaced and upgraded.
  • Pathways through the area will be enhanced to improve accessibility and connectivity.
  • New planting will be added to support local habitat along the enhanced drainage ditch.

During construction, the active work area will be fenced off. Temporary alternative routes will be provided, and park users are asked to follow directional signage and posted instructions.

Who it affects

Anyone who uses Minoru Park, particularly those who travel through the area south of Minoru Lakes, will encounter temporary route changes during construction.

Key dates

  • October 2026: Construction scheduled to begin.
  • Summer 2027: Completion anticipated, depending on weather and site conditions.

Where to read more

Richmond.ca – Minoru Park Construction

Source: Minoru Park Construction

Where this comes from

  1. Minoru Park Construction (City of Richmond: News Releases 2026)richmond.ca, opened October 22, 2026